Milestone Photos

    Groundbreaking (8/27/09) Sitework (9/25/09)

    Groundbreaking (8/27/09)

    Sitework (9/25/09)


    Footings (9/30/09) Structural Steel (10/12/09)

    Footings (9/30/09)

    Structural Steel (10/12/09)


    200-yard Floor Pour (11/02/09) Framing (11/13/09)

    200-yard Floor Pour (11/02/09)

    Framing (11/13/09)


    Roof Trusses (11/18/09) Wood Sheathing (12/17/09)

    Roof Trusses (11/18/09)

    Wood Sheathing (12/17/09)


    Wood Sheathing (1/11/10) Roof Tiles (2/3/10)

    Wood Sheathing (1/11/10)

    Roof Tiles (2/3/10)


    Stucco Prep (3/25/10) Sheetrock (4/21/10)

    Stucco Prep (3/25/10)

    Sheetrock (4/21/10)


    Exterior Paint (5/17/10) Flatwork Prep (9/7/10)

    Exterior Paint (5/17/10)

    Flatwork Prep (9/7/10)


    Flatwork (9/13/10) Final (10/8/10)

    Flatwork (9/13/10)

    Final (10/8/10)

    1500 Bollinger Canyon Road, San Ramon CA 94583
    (925) 838-6600 | info@firedepartment.org