Groundbreaking (8/27/09)
Sitework (9/25/09)
Footings (9/30/09)
Structural Steel (10/12/09)
200-yard Floor Pour (11/02/09)
Framing (11/13/09)
Roof Trusses (11/18/09)
Wood Sheathing (12/17/09)
Wood Sheathing (1/11/10)
Roof Tiles (2/3/10)
Stucco Prep (3/25/10)
Sheetrock (4/21/10)
Exterior Paint (5/17/10)
Flatwork Prep (9/7/10)
Flatwork (9/13/10)
Final (10/8/10)